Warning: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead in /home1/fdcaes/public_html/libraries/joomla/filter/input.php on line 652

Warning: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead in /home1/fdcaes/public_html/libraries/joomla/filter/input.php on line 654

Warning: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead in /home1/fdcaes/public_html/libraries/joomla/filter/input.php on line 652

Warning: preg_replace(): The /e modifier is no longer supported, use preg_replace_callback instead in /home1/fdcaes/public_html/libraries/joomla/filter/input.php on line 654

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home1/fdcaes/public_html/templates/fdca12/functions.php on line 647
RENOVATION AND EXTENSION OF THE SERRANO THEATRE IN GANDIA
ES   EN   中文

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home1/fdcaes/public_html/modules/mod_menu/helper.php on line 85


Warning: count(): Parameter must be an array or an object that implements Countable in /home1/fdcaes/public_html/libraries/joomla/application/application.php on line 481

Warning: Use of undefined constant en - assumed 'en' (this will throw an Error in a future version of PHP) in /home1/fdcaes/public_html/components/com_proyectodet/proyectodet.php on line 109

The project of full renovation, restoration and extension covers two theatres and uses some parts of the existing façade as a new proposal for the new extension. The main theatre hall takes on the shape of an big italian style theatre which is provided with a full equipment. The foyer is located between the two theatres becoming the new centre of the building. The dialogue between architecture and the functional uses of the historic architecture is a manifestation volumetric covers theatre. The facades are preserved and new volumes and spaces in the building are introduced. The main objective of the project is maintain the volume of the original cover body façade, to preserve the appearance of the building modernist. Theatre is rebuilt with concrete structure, the exterior walls and the stage area with climbing formwork are made, which allow concrete walls of a high rise quickly without high-rise scaffolding and a stage box is built to house all the mechanical systems necessary for performing a modern theatre.


Warning: Use of undefined constant en - assumed 'en' (this will throw an Error in a future version of PHP) in /home1/fdcaes/public_html/components/com_proyectodet/proyectodet.php on line 109

Warning: Use of undefined constant en - assumed 'en' (this will throw an Error in a future version of PHP) in /home1/fdcaes/public_html/components/com_proyectodet/proyectodet.php on line 109

Warning: Use of undefined constant en - assumed 'en' (this will throw an Error in a future version of PHP) in /home1/fdcaes/public_html/components/com_proyectodet/proyectodet.php on line 109